← All datasets

GPU clusters

Our database of over 500 GPU clusters and supercomputers tracks large hardware facilities, including those used for AI training and inference.

Charts and analysis of these data →

gpu_clusters.csv

474 rows · 57 columns · Updated 2026-11-09

Download CSV

NameStatusCertaintySingle cluster?Max OP/s (log)H100 equivalentsChip type (primary)Chip quantity (primary)CountryOwnerFirst Operational DateNoteSectorPower Capacity (MW)Hardware CostLocationUsersHardware noteQuoteFirst Operational Date NoteCertainty NoteEnergy Efficiency (log)Builds UponSuperseded byPossible DuplicatePossible Duplicate OfChip type (secondary)Chip quantity (secondary)Total number of AI chipsGPU Supplier (primary)GPU supplier (secondary)Include in Standard AnalysisExcludeRank when first operational16-bit OP/s (log)Max OP/s8-bit OP/s16-bit OP/s32-bit OP/sCalculated Power Capacity (MW)Reported Power Capacity (MW)Energy EfficiencyCalculated CostReported CostReported Cost (Inflation adjusted)Cost QuoteNoteworthyDecommissioned Date (if applicable)Largest existing cluster when first operational% of largest cluster when first operationalSource 1Source 2Source 3Source 4Source 5latitudelongitude
xAI Colossus Memphis Phase 3ExistingConfirmedYes20.737033531333875275795.85649723833NVIDIA H100 SXM5 80GB200000United States of AmericaxAI2025-07-22we know from earlier that it has 150k H100s and 50k H200s, which makes the total 150k H100s 50k H200s 30k GB200sPrivate352.3523231 Riverport Rd, Memphis, TN 38109xAI150k H100s, 50k H200s, 30k GB200s,H100,GB200,H200"230k GPUs, including 30k GB200s, are operational for training Grok @xAI in a single supercluster called Colossus 1"2025-07-2211.889026794712445xAI Colossus Memphis Phase 2NVIDIA GB20030000230000NVIDIANVIDIATrue20.436003535669897545800000000000000000545800000000000000000272900000000000000000136440000000000000000352.352774509581327.7632Truehttps://archive.ph/oHQSA35.069154-90.118494
xAI Colossus Memphis Phase 2ExistingLikelyYes20.597475789870376200000.000002945NVIDIA H100 SXM5 80GB150000United States of AmericaxAI2025-02-18GPU types is from a tweet. Unclear exactly when it was first operational. It was confirmed to be operational Feb 17, 2025, but some evidence suggests that it was operational by December 4th, 2024Private280.287120201208.6815843231 Riverport Rd, Memphis, TN 38109xAIH100,H200This weekend, the @xAI team brought our Colossus 100k H100 training cluster online.... Moreover, it will double in size to 200k (50k H200s) in a few months.2025-02-1811.848853685384858xAI Colossus Memphis Phase 1xAI Colossus Memphis Phase 3NVIDIA H200 SXM50000200000NVIDIANVIDIATrue120.2964457942063939580000000000000000039580000000000000000019790000000000000000098930000000000000000280.28706079634651.06327120201208.681584xAI Colossus Memphis Phase 21https://archive.ph/z39uNhttps://web.archive.org/web/20241217184541/https://memphischamber.com/economic-development/xai/https://web.archive.org/web/20241217184541/https://memphischamber.com/economic-development/xai/https://www.youtube.com/watch?v=AUAJ82H12qs&t=260s35.069154-90.118494
xAI Colossus Memphis Phase 1ExistingConfirmedYes20.29644579420639100000.00000147166NVIDIA H100 SXM5 80GB100000United States of AmericaxAI2024-09-02Private1503802927639.1012943231 Riverport Rd, Memphis, TN 38109xAIH100"With 100k liquid-cooled H100s on a single RDMA fabric" "This weekend, the @xAI team brought our Colossus 100k H100 training cluster online.... Moreover, it will double in size to 200k (50k H200s) in a few months"2024-09-02Reported to be online by Musk11.819324539486733xAI Colossus Memphis Phase 2100000NVIDIATrue119.9954157985424141979000000000000000001979000000000000000009895000000000000000049470000000000000000142.688150659666666666.66663802927639.101294xAI Colossus Memphis Phase 11https://archive.ph/Bh9Tqhttps://web.archive.org/web/20240727065656/https://www.commercialappeal.com/story/news/government/city/2024/07/09/elon-musk-xai-memphis-electricity-water-mlgw/74331544007/https://archive.ph/z39uN35.069154-90.118494
Meta 100kExistingLikelyYes20.29644579420639100000.00000147166NVIDIA H100 SXM5 80GB100000United States of AmericaMeta AI2024-10-30Reported as operational in October 2024 earnings callPrivate142.6883810062229.221386United States of AmericaMetaH100Meta Platforms is putting the final touches on one such cluster, which will be a little bigger than 100,000 H100s2024-10-30Reported by The Information11.8410283478729100000NVIDIATrue119.9954157985424141979000000000000000001979000000000000000009895000000000000000049470000000000000000142.688693471069746.583810062229.221386TruexAI Colossus Memphis Phase 11https://archive.ph/85KB1https://web.archive.org/web/20240901171617/https://www.semianalysis.com/p/100000-h100-clusters-power-networkhttps://web.archive.org/web/2/https://www.tomshardware.com/tech-industry/artificial-intelligence/meta-is-using-more-than-100-000-nvidia-h100-ai-gpus-to-train-llama-4-mark-zuckerberg-says-that-llama-4-is-being-trained-on-a-cluster-bigger-than-anything-that-ive-seenhttps://web.archive.org/web/20241228090751/https://www.tomshardware.com/tech-industry/artificial-intelligence/meta-is-using-more-than-100-000-nvidia-h100-ai-gpus-to-train-llama-4-mark-zuckerberg-says-that-llama-4-is-being-trained-on-a-cluster-bigger-than-anything-that-ive-seen39.381266-97.922211
OpenAI/Microsoft Goodyear ArizonaExistingLikelyYes20.29644579420639100000.00000147166NVIDIA H100 SXM5 80GB100000United States of AmericaMicrosoft,OpenAI2024-10-02It seems likely that this became operational in phases. It seems like 75k were likely available sometime mid 2024, and ~160k will be available in the future. There is very little official public data about this cluster, it's almost all infrences/rumors Microsoft appears to own it and rent it to OpenAI The Semianalysis lecture estimates that there are 32k H100s (48MW) per building. Satellite data as of Dec 2024 seems to show that 5 building are now complete (though this doesn't imply that the clusters inside have been built or are operational). This would imply that the cluster is growing to ~160k GPUs. It's also unclear if the newer buildings would still have Hoppers or would have Blackwell chips I personally suspect that this cluster was one of the primary clusters for training GPT4.5Private142.6883802450830.80129933°24'28.7"N 112°21'54.3"W Goodyear, Arizona, USAOpenAIH100"You already have 100K clusters. OpenAI in Arizona" "Our data shows one of OpenAI’s next training supercomputers in Arizona was going to have more than 75,000+ GPUs in a singular site by the middle of next year"2024-10-02This estimate is from the SemiAnalysis number of GPUs/building, and satellite imagery showing that they've built 5 buildings11.8410283478729100000NVIDIATrue119.9954157985424141979000000000000000001979000000000000000009895000000000000000049470000000000000000142.688693471069746.583802450830.801299xAI Colossus Memphis Phase 11https://web.archive.org/web/20241006181731/https://www.dwarkeshpatel.com/p/dylan-jonhttps://web.archive.org/web/20240609051243/https://www.semianalysis.com/p/microsoft-swallows-openais-core-teamhttps://www.youtube.com/watch?v=hobvps-H38o33.190283-111.966202
Oracle OCI Supercluster H200sExistingLikelyYes20.1129257248300965536.0000009646NVIDIA H200 SXM65536United States of AmericaOracle2024-11-21Unclear exactly when this first became operational, if it was ever built. The announcement November 2024 states that the largest supercomputer in the cloud is now generally available, implying that this cluster has been built and is operational. However, it's possible that they're just advertising their capacity to scale H200 clusters to be the largest supercomputer in the cloud. It seems very likely that this cluster has been built, but it's not fully certain. I estimate the first operational date to be Q1 2025 to be slightly conservative on the timingPrivate93.512007680000012345609100.860053CloudH200We’re excited to announce the general availability of Oracle Cloud Infrastructure (OCI) Supercluster with NVIDIA H200 Tensor Core GPUs. The largest AI supercomputer available in the cloud*, our latest Supercluster scales up to an industry-leading 65,536 GPUs.2024-11-2111.841028347872965536NVIDIATrue419.811895729166114129695744000000000000129695744000000000000648478720000000000003240755200000000000093.51200768000001693471069746.582345609100.860053xAI Colossus Memphis Phase 10.6553600000000014https://archive.ph/B3HJm#selection-1045.0-1045.83https://web.archive.org/web/20241214043143/https://www.datacenterdynamics.com/en/news/oracles-65000-gpu-supercluster-now-generally-available/39.381266-97.922211
Tesla Cortex Phase 1ExistingConfirmedYes19.99541579854241450000.00000073623NVIDIA H100 SXM5 80GB50000United States of AmericaTesla2024-11-15Private71.3441905031114.6106931 Tesla Rd, Austin, TX 78725TeslaH100Tesla completed the deployment of its 50,000 Nvidia H100 GPU training cluster during Q4 2024.Q4 202411.841028347872950000NVIDIATrue419.6943858028784339895000000000000000098950000000000000000494750000000000000002473500000000000000071.344693471069746.581905031114.610693xAI Colossus Memphis Phase 10.500000000000004https://web.archive.org/web/20250217061801/https://www.datacenterdynamics.com/en/news/teslas-50000-gpu-cortex-supercomputer-went-live-in-q4-2024/https://web.archive.org/web/20240822222555/https://www.fool.com/earnings/call-transcripts/2024/07/24/tesla-tsla-q2-2024-earnings-call-transcript/https://web.archive.org/web/20240904184237/https://www.tomshardware.com/desktops/servers/elon-musk-shows-off-cortex-ai-supercluster-first-look-at-teslas-50000-nvidia-h100s30.222695-97.618788
Lawrence Livermore NL El Capitan Phase 2ExistingConfirmedYes19.94131109816858744143.351592362786AMD Instinct MI300A44544United States of AmericaUS Department of Energy2024-11-18Public35607324736.6965789Lawrence Livermore National Laboratory 7000 East Ave, Livermore, CA 94550US Government,Lawrence Livermore NL,Scientific ResearchAMD MI300Athe system has 11,136 nodes packed with 44,544 of AMD's MI300A APUs2024-11-1812.096213058154332Lawrence Livermore NL El Capitan Phase 144544AMDTrue519.6402811025046068735969280000000000087359692800000000000436798464000000000002183992320000000000069.00685209600002351247995611428.57151826641892.232672600000000607324736.6965789$600M was quoted as the max cost TruexAI Colossus Memphis Phase 10.4414335159171314https://web.archive.org/web/20241122140255/https://www.tomshardware.com/pc-components/cpus/amd-powered-el-capitan-is-now-the-worlds-fastest-supercomputer-with-1-7-exaflops-of-performance-fastest-intel-machine-falls-to-third-place-on-top500-list37.682018-121.768374
CoreWeave H200sExistingLikelyYes19.91969508460429642000.00000061847NVIDIA H200 SXM42000United States of AmericaCoreWeave2024-08-28Private59.928960000000011499797837.3467495CoreWeaveH200These instances are deployed in clusters with up to 42,000 GPUs2024-08-2811.841028347872942000NVIDIATrue119.6186650889403158311800000000000000083118000000000000000415590000000000000002076900000000000000059.92896000000001693471069746.57981499797837.3467495CoreWeave H200s1https://web.archive.org/web/20250107015942/https://www.coreweave.com/blog/coreweave-is-the-first-cloud-provider-to-deploy-nvidia-h200-tensor-core-gpus39.381266-97.922211
Meta GenAI 2024bExistingConfirmedYes19.68695699255781424576.000000361928NVIDIA H100 SXM5 80GB24576United States of AmericaMeta AI2024-03-12At least one of these was used to train Llama 3Private35.067002880000004880071195.8491452MetaH100Today, we’re sharing details on two versions of our 24,576-GPU data center scale cluster at Meta2024-03-12From official Meta announcement. At least one of these was used to train Llama 3.111.841028347872924576NVIDIATrue119.3859269968938334863590400000000000048635904000000000000243179520000000000001215774720000000000035.067002880000004693471069746.58880071195.8491452Meta GenAI 2024a1http://web.archive.org/web/20240828225612/https://engineering.fb.com/2024/03/12/data-center-engineering/building-metas-genai-infrastructure/https://web.archive.org/web/20240827223115/https://www.semianalysis.com/p/gpt-4-architecture-infrastructure39.381266-97.922211
Meta GenAI 2024aExistingConfirmedYes19.68695699255781424576.000000361928NVIDIA H100 SXM5 80GB24576United States of AmericaMeta AI2024-03-12At least one of these was used to train Llama 3Private35.067002880000004880071195.8491452MetaH100Today, we’re sharing details on two versions of our 24,576-GPU data center scale cluster at Meta2024-03-12From official Meta announcement. At least one of these was used to train Llama 3.111.841028347872924576NVIDIATrue119.3859269968938334863590400000000000048635904000000000000243179520000000000001215774720000000000035.067002880000004693471069746.58880071195.8491452TrueMeta GenAI 2024a1http://web.archive.org/web/20240828225612/https://engineering.fb.com/2024/03/12/data-center-engineering/building-metas-genai-infrastructure/https://web.archive.org/web/20240827223115/https://www.semianalysis.com/p/gpt-4-architecture-infrastructure39.381266-97.922211
"Jupiter, Jülich"ExistingConfirmedYes19.6681784495898523536.00000034651NVIDIA GH20023536GermanyEuroHPC JU,Julich Supercomputing Center2025-06-10Public18290000685.87105626Jülich Supercomputing Centre (JSC) 52428 Jülich, GermanyGH200"JUPITER marks the debut of a quad NVIDIA GH200 Grace Hopper Superchip node configuration, based on Eviden’s BullSequana XH3000 liquid-cooled architecture, with a booster module comprising close to 24,000 NVIDIA GH200 Superchips interconnected with the NVIDIA Quantum-2 InfiniBand networking platform." "If you look at the Top500 spreadsheet, it tells you the total number of cores used in the machine, plus the number of cores used by accelerators. (These cores are synonymous with a streaming multiprocessor in a GPU architecture, not a count of CUDA cores or tensor cores.) The Jupiter GPU Booster used for the HPL test that have it the number four ranking had 4,801,344 cores and of these, there are 3,106,752 cores allocated to the GPUs, which leaves 1,694,592 cores in the CPU hosts. At 72 cores per Grace, that is 23,536 Grace CPUs and therefore 23,536 Grace-Hopper units and therefore 23,536 Hopper H200 GPUs."2025-06-1012.11187594882256323536NVIDIATrue19.3671484539258684657774400000000000046577744000000000000232888720000000000001163855200000000000032.9833504181293826222222.22221089491617.5764012287000000290000685.87105626EuroHPC says in a statement that the cost of building, delivering, installing, and maintaining the Jupiter machine is €273 million ($287.3 million), and presumably the remaining part of that €500 million is to build or retrofit a datacenter for Jupiter and pay for power and cooling for the machine.https://web.archive.org/web/20240825120701/https://nvidianews.nvidia.com/news/nvidia-grace-hopper-superchip-powers-jupiter-defining-a-new-class-of-supercomputers-to-propel-ai-for-scientific-discoveryhttps://archive.is/oyvz9https://archive.ph/wip/HgCqohttps://www.anandtech.com/show/21136/nvidia-at-sc23-h200-accelerator-with-hbm3e-and-jupiter-supercomputer-for-2024https://top500.org/system/180357/50.9217346.358342