AI data centers

Open database of AI data centers using satellite and permit data to show AI compute, power use, and construction timelines.

Графики и аналитика по этим данным →

data_center_chillers.csv

143 строк · 12 колонок · Обновлено 2026-11-09

Скачать CSV

ModelManufacturerTypeCooling capacity (kW)Number of fansLength (m)Width (m)Area (m^2)SourceLinkSpot checkNotes
ACCPS161General Air ProductsAir-cooled48.1821.860.761.4136000000000002General Air product page showing 13.7 ton capacity and two fanshttps://www.generalairproducts.com/product/accps161/#:~:text=SKU%20ACCPS161%20Chiller%20Type%20Packaged,2%E2%80%B3%20Tank%20Volume%20%28gallons%29%2067Not sure where the Width number came from
ACCPS201General Air ProductsAir-cooled55.5622.260.871.9661999999999997General Air product page for ACCPS201 (15.8 tons, two fans)https://www.generalairproducts.com/product/accps201/#:~:text=SKU%20ACCPS201%20Chiller%20Type%20Packaged,2%E2%80%B3%20Tank%20Volume%20%28gallons%29%2093
ACCPS402General Air ProductsAir-cooled104.123.291.254.1125General Air ACCPS402 page showing 29.6 ton capacity and two fanshttps://www.generalairproducts.com/product/accps402/#:~:text=SKU%20ACCPS402%20Chiller%20Type%20Packaged,kg%29%201250
ACCPS602General Air ProductsAir-cooled138.9223.291.254.1125General Air ACCPS602 page (39.5 tons, two fans)https://www.generalairproducts.com/product/accps602/#:~:text=SKU%20ACCPS602%20Chiller%20Type%20Packaged,7%E2%80%B3%20Tank%20Volume%20%28gallons%29%20132
ACCPS702General Air ProductsAir-cooled169.1633.541.254.425General Air page noting 48.1 ton capacity and three fans
MG 50 HPMgreenbeltAir-cooled126.642.31.94.369999999999999Mgreenbelt table (50 HP model, four fans, 2300 mm × 1900 mm)https://mgreenbeltchiller.en.made-in-china.com/product/EwCtsxYPYfrN/China-Refrigeration-Unit-120HP-93tr-330kw-Industrial-Air-Cooled-Water-Chiller-Cooling-System.html#:~:text=50HP%2060HP%2075HP%2080HP%20100HP,2500%202650%203000%203600%204200
MG 60 HPMgreenbeltAir-cooled151.563.31.755.7749999999999995Mgreenbelt table (60 HP model with six fans)https://mgreenbeltchiller.en.made-in-china.com/product/EwCtsxYPYfrN/China-Refrigeration-Unit-120HP-93tr-330kw-Industrial-Air-Cooled-Water-Chiller-Cooling-System.html#:~:text=50HP%2060HP%2075HP%2080HP%20100HP,2500%202650%203000%203600%204200
MG 75 HPMgreenbeltAir-cooled189.942.42.175.207999999999999Mgreenbelt table (75 HP model uses four fans)https://mgreenbeltchiller.en.made-in-china.com/product/EwCtsxYPYfrN/China-Refrigeration-Unit-120HP-93tr-330kw-Industrial-Air-Cooled-Water-Chiller-Cooling-System.html#:~:text=50HP%2060HP%2075HP%2080HP%20100HP,2500%202650%203000%203600%204200
MG 80 HPMgreenbeltAir-cooled202.083.872.017.7787Mgreenbelt table (80 HP model uses eight fans)https://mgreenbeltchiller.en.made-in-china.com/product/EwCtsxYPYfrN/China-Refrigeration-Unit-120HP-93tr-330kw-Industrial-Air-Cooled-Water-Chiller-Cooling-System.html#:~:text=50HP%2060HP%2075HP%2080HP%20100HP,2500%202650%203000%203600%204200
MG 100 HPMgreenbeltAir-cooled253.284.122.18.652000000000001Mgreenbelt table (100 HP model uses eight fans)https://mgreenbeltchiller.en.made-in-china.com/product/EwCtsxYPYfrN/China-Refrigeration-Unit-120HP-93tr-330kw-Industrial-Air-Cooled-Water-Chiller-Cooling-System.html#:~:text=50HP%2060HP%2075HP%2080HP%20100HP,2500%202650%203000%203600%204200
MG 120 HPMgreenbeltAir-cooled315.085.52.212.100000000000001Mgreenbelt table (120 HP model, eight fans)https://mgreenbeltchiller.en.made-in-china.com/product/EwCtsxYPYfrN/China-Refrigeration-Unit-120HP-93tr-330kw-Industrial-Air-Cooled-Water-Chiller-Cooling-System.html#:~:text=50HP%2060HP%2075HP%2080HP%20100HP,2500%202650%203000%203600%204200Multiple conflicting cooling capacity numbers mentioned in the product description: 330kw, 203kw, 315 for "+7ºC outlet", 375 for "+12ºC outlet (the latter two aren't conflicting, they just sound like different settings). The page has a table of _all_ of the units at different horsepower, which is where all of the MG entries here seem to be sourced from. All of the kW numbers here match the "+7ºC outlet" row in that table. The dimensions and number of fans also match. But the length in the "Basic info" section is 3.85m instead of 5.5. Makes me trust this source less.
MG 150 HPMgreenbeltAir-cooled420.0125.852.1712.6945Mgreenbelt table (150 HP model with twelve fans)https://mgreenbeltchiller.en.made-in-china.com/product/EwCtsxYPYfrN/China-Refrigeration-Unit-120HP-93tr-330kw-Industrial-Air-Cooled-Water-Chiller-Cooling-System.html#:~:text=50HP%2060HP%2075HP%2080HP%20100HP,2500%202650%203000%203600%204200

data_center_cooling_towers.csv

527 строк · 17 колонок · Обновлено 2026-11-09

Скачать CSV

ModelManufacturerLength (m)Width (m)Height (m)Area (m^2)Cooling capacity (stated, kW)Cooling capacity (central estimate, kW)SourceLinkSpot checkNotesFan Diameter (m)Number of FansFan estimate diameter (m)TypeMotor Horsepower
XES3E-1020-07GBAC6.123.03.7118.351,0011001.0Product Cataloghttps://www.calameo.com/read/0073621279a1d0c9ca0e2?authid=Ms66hE7oFhAO1.02.84999999999999963.0
XES15E-1212-09GCBAC4.343.664.2415.891,0051005.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.03.477
XES3E-8518-06HBAC5.512.593.414.281,0101010.0Product Cataloghttps://www.calameo.com/read/0073621279a1d0c9ca0e2?authid=Ms66hE7oFhAO1.02.46049999999999975.0
XES15E-1212-11FNBAC5.163.665.0518.861,0141014.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.03.477
XES3E-8518-05JBAC5.512.593.014.281,0231023.0Product Cataloghttps://www.calameo.com/read/0073621279a1d0c9ca0e2?authid=Ms66hE7oFhAO1.02.46049999999999977.5
XES15E-1285-10KNBAC4.782.594.7812.371,0231023.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.02.4604999999999997
S15E-1285-07MNBAC3.452.593.388.951,0361036.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.02.4604999999999997
XES15E-1212-12FNBAC5.563.665.4620.351,0491049.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.03.477
XES15E-1212-10GCBAC4.753.664.6517.371,0581058.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.03.477
XES15E-1212-09GNBAC4.343.664.2415.891,0671067.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.03.477
XES3E-1020-06HBAC6.123.03.318.351,0711071.0Product Cataloghttps://www.calameo.com/read/0073621279a1d0c9ca0e2?authid=Ms66hE7oFhAO1.02.84999999999999965.0
XES15E-1212-07HNBAC3.453.663.3812.631,0841084.0https://www.calameo.com/read/007362127e29aeca4d414?authid=Vtd8DMG7ouV61.03.2775

data_center_timelines.csv

573 строк · 14 колонок · Обновлено 2026-11-09

Скачать CSV

Data centerDateConstruction statusBuildings operationalIT power (MW)Power (MW)H100 equivalentsPerformance (8-bit OP/s)Total capital cost (2025 USD billions)Compute cost (2025 USD billions)Construction cost (2025 USD billions)Annual operating cost (2025 USD billions)Water use (MGD)Current H100 equivalents (from Data center)
Colossus 22025-02-28Land clearing begins next to the existing building.0.00.00.00.000.00.00.00.01111672.5618999496
Colossus 22025-09-08Battery facility connected to the building. 121 air-cooled chillers installed, which could support 200 MW. In the Duke faciltiy in nearby Mississippi, several natural gas turbines are in place but not fully connected up.0.00.00.00.000.00.00.00.01111672.5618999496
Colossus 22025-10-19Battery facility looks complete (though more might be added). Turbines look connected up, minimal construction around them. We believe this state corresponds to the first compute cluster brought online at this site of "approximately 110,000 GB200 processors, approximately 210 megawatts of compute power", as detailed in the [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm). Based on those numbers, we believe "compute power" corresponds to GPU server power. [Earlier](https://x.com/elonmusk/status/1947715674429919279) [tweets](https://x.com/elonmusk/status/1950251710141567110) from Elon Musk also support this timing, and it's consistent with the estimated cooling capacity based on the satellite image.1.0239.0323.0277918.14047498745500000000000000000009.0537986.2410072.8127910.2155781111672.5618999496
Colossus 22026-01-13Since October, an array of dry cooling air-cooled condensers has been added (the array of large fans to the left of the building), and appears almost complete. Two more similar arrays appear to be under construction. More air-cooled chillers, batteries, and gas turbines have also been installed.1.0239.0323.0277918.14047498745500000000000000000009.0537986.2410072.8127910.2155781111672.5618999496
Colossus 22026-04-06The first array of dry cooling air-cooled condensers for Building 1 has been completed and is operational. A second array, with larger fans, is about halfway complete (located to the south of the first array). More chillers have also been added. For Building 2, an array of dry cooling air-cooled condensers of the same type as Building 1's first array is beginning construction. We believe this corresponds to the "second cluster of 110,000 GB300 processors and 220 megawatts of compute power" from the [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm), with compute power corresponding to GPU server power. This is also consistent with our estimates based on cooling equipment.1.0490.0661.0555836.28094997481.1e+2118.56217999999999812.795375.76680999999999950.441981111672.5618999496
Colossus 22026-06-15The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of expansion" found in the following [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm). This estimate is backed up by our cooling and turbine based power production calculations. The cooling calculations suggest there is enough infrastructure to support ~850MW of IT Power. Similarly the energy production calculations support ~900MW of available IT Power. This gives us confidence that the proposed expansion was achieved in time. The roof for building 3 is halfway complete. 2.0946.01276.01111672.56189994962.2e+2135.83637224.70289799999999811.1334740.85329199999999991111672.5618999496
Colossus 22027-02-25Building 3 is estimated to be completed. The site is predicted to have enough power infrastructure installed for a total of 1.5 GW of IT Power. Based on building plans we predict the addition of three more cooling arrays similar to the 6x24 dry coolers near Building 1 and 2. With the completion of current cooling structures and the addition of these arrays there will be ~540MW more cooling capacity for a full facility total of ~1390MW. If this cooling capacity is supplemented by mobile coolers, there would be enough cooling and power infrastructure to support 1.5 GW of IT power.3.01531.02065.01824153.61293582623.61e+2157.99734199999999639.97900318.0183389999999971.3809621111672.5618999496
OpenAI Stargate Abilene2024-05-31Land clearing begins for northern two buildings (Building 1-2)0.00.00.00.000.00.00.00.01018696.3112683173
OpenAI Stargate Abilene2025-06-28Building 1 looks close to finishing construction, with chillers in place. OpenAI [stated](https://openai.com/index/five-new-stargate-sites/) that "Oracle began delivering the first NVIDIA GB200 racks in June." The "tenant improvement" work [is not due](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025000156) until September, however.0.00.00.00.000.00.00.00.01018696.3112683173
OpenAI Stargate Abilene2025-09-26Building 1 is fully operational around this date. The first phase was "live" on September 30 according a Crusoe [announcement](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live). While the first phase consists of Building 1 and 2, the language doesn't outright confirm that both buildings are fully operational. The announcement also stated that "Oracle began delivering the first NVIDIA GB200 racks in June", and we think 3 months is enough time to ram to 50,000 GB200s in Building 1. The satellite image also suggests that Building 1 is complete (shell and equipment done, many cars neatly parked) while Building 2 is ongoing (trucks and construction equipment still present). The 200 MW [substation](https://www.mortenson.com/projects/abilene-data-center-development) built in 2022 and expanded in 2024 is enough to power both buildings. To the right of Building 2, five gas turbines are in place with five more turbines still under construction. Chillers are partly installed for Building 3. Roof is complete for Building 4. The larger 1 GW substation is not complete yet.1.0103.0144.0127337.038908539662520000000000000000003.9018462.68963899999999971.2122070.0929061018696.3112683173
OpenAI Stargate Abilene2025-12-24Building 2 is fully operational. This exact date corresponds to the expected completion date of "Four (4) data hall spaces and an administrative office build-out" according to a [TDLR filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025007742), but this date is also consistent with satellite imagery. By January 15, Building 2 looked as finished as Building 1, whereas on September 26 it did not look finished.2.0206.0288.0254674.077817079325040000000000000000007.8036925.3792779999999992.4244140.1858121018696.3112683173
OpenAI Stargate Abilene2026-01-15The 1 GW substation looks close to completion. Building 3 appears to have all power and cooling equipment installed, but there are still signs of construction work. This seems on track for operation in 3 months. Building 4 has about 80% of chillers installed. Other buildings have few or no chillers installed.2.0206.0288.0254674.077817079325040000000000000000007.8036925.3792779999999992.4244140.1858121018696.3112683173

data_centers.csv

96 строк · 16 колонок · Обновлено 2026-11-09

Скачать CSV

NameCurrent H100 equivalentsCurrent power (MW)Current total capital cost (2025 USD billions)OwnerUsersSelected SourcesCalculations sheetProjectCurrent chip typesAll chip typesInvestorsConstruction companiesEnergy companiesCountryAddress
Colossus 21111672.561899949694635.836372SpaceXAI #confidentAnthropic #confident, Cursor #confident, SpaceXAI #confident- [WSJ profile of the Colossus data centers](https://www.wsj.com/tech/elon-musk-xai-memphis-tennessee-power-dec4c70d)  - [Final GPU count reported by Elon Musk](https://x.com/elonmusk/status/1947701807389515912) - [MLGW update mentioning power requests for Colossus 2](https://www.mlgw.com/images/content/files/pdf/new/5-5-25%20xAI%20Update.pdf#page=4) - [SpaceX-Cursor partnership to use Colossus](https://x.com/SpaceX/status/2046713419978453374) - [Anthropic to use Colossus 2 from June 2026](https://x.com/nottombrown/status/2057194829986300375) - [SpaceX S-1 filing, mentioning exact compute and power for Colossus 2](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm) https://docs.google.com/spreadsheets/d/1oZpZ9nTTV6wW0xjc1pPOQmKS7NCyDzuG2HiycC1GqFs/edit?usp=sharingB200,B300B200,B300United States5420 Tulane Rd, Memphis, TN 38109
OpenAI Stargate Abilene1018696.311268317382431.214768Oracle #confidentOpenAI #confident- [Crusoe 2024 Impact Report, with details on Abilene](https://drive.google.com/file/d/1oHWA9vmpvFOh-LvDy5fgq_wq5ITuxd1r/view?usp=sharing) - [Air Permit Application for buildings 1-2, featuring blueprints on p.157](https://drive.google.com/file/d/1FgfX6hqojlBtqNXJHjzJmnwWAMx4_M0b/view?usp=sharing) - [Mortensen’s profile of the project, with details of substations](https://www.mortenson.com/projects/abilene-data-center-development) https://docs.google.com/spreadsheets/d/1M5VPpNDGTPgssU1x3xQJKv33EIa7-wgpDIFM8uzpodQ/edit?usp=sharingStargate #confidentB200,B300B200,B300Softbank,OpenAI,OracleMortensonAmerican Electric PowerUnited States5502 Spinks Rd, Abilene, TX 79601
Anthropic-Amazon New Carlisle818428.4992420415103739.283634Amazon #confidentAnthropic #confident- [Air Construction Permit application for the northern portion](https://drive.google.com/file/d/1BKiTFNUk2KDaUaiHG7fz0KlkNSBTHzbb/view?usp=sharing) - [Backup diesel generator referenced in the permit](https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html) - [Announcement of Project Rainier coming online](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) - [Air permit for Buildings 19-32, suggesting expansion to 2.3 GW total facility power](https://t.co/HsAO7oyKa2) https://docs.google.com/spreadsheets/d/1umU-KLAB_6A-lKRCdLuF7SPv74HlqKjDdfDor1bRGuY/edit?usp=sharingProject Rainier #confidentTrainium2Trainium2United States55001 Larrison Blvd, New Carlisle, IN 46552
Microsoft Fairwater Atlanta768768.722081859663624.092952Microsoft #confidentOpenAI #likely, Microsoft #likely- [2023 Air Permit application](https://drive.google.com/file/d/1p7aY9syz319IcEuyukgIIvzmhTNKRS6p/view?usp=sharing) - [YouTube video with aerial views](https://www.youtube.com/watch?v=44eWesI-174) - [OpenAI article mentioning they use Microsoft's Fairwater supercomputers](https://openai.com/index/mrc-supercomputer-networking/) - [Bloomberg article](https://www.bloomberg.com/news/features/2024-12-08/georgia-s-blackstone-backed-qts-data-center-hits-resistance-over-ai-power-needs) https://docs.google.com/spreadsheets/d/1XeruHu2ES3UsSrsAU3HSMkk5zwzFOQzxQE9pQ_fuEUw/edit?usp=sharingMicrosoft AI WAN #confidentB200B200Georgia PowerUnited States1435 Hwy 54 W, Fayetteville, GA 30214
Google Pryor (North)636685.194542698336813.940576Google #confidentGoogle DeepMind #speculative- [Google announces expansion of Pryor facility](https://blog.google/inside-google/company-announcements/google-american-innovation-oklahoma/) - [Google 2025 Environmental Report](https://sustainability.google/reports/google-2025-environmental-report/) with PUE and water use on pp.109-110 - [News of a 9 exaflop TPUv4 cluster in the Pryor data center, launched in 2022](https://techcrunch.com/2022/05/11/google-launches-a-9-exaflop-cluster-of-cloud-tpu-v4-pods-into-public-preview/) https://docs.google.com/spreadsheets/d/1lD_rxcr7NwyAXlJf2TUis1AuMry4jGJNxOFP8zn17zc/edit?usp=sharingTPU v5p,TPU v5eTPU v5p,TPU v5eUnited States4581 Webb St, Pryor, OK 74361
DayOne Nusajaya583836.786255684747317.918186- [News of Phase 2 operation](https://www.moomoo.com/news/post/41886329/support-ai-computing-deployment-gds-holdings-nusajaya-technology-park-datacenter?level=1&data_ticket=1778269491837872) - [Archived DayOne website - "120 MW in operation" in Johor](https://web.archive.org/web/20241231165420/https://dayonedc.com/) - [Archived DayOne website - 390 MW "in service" in Johor](https://web.archive.org/web/20260314134756/https://dayonedc.com/market/johor) - [Financial Times report that Alibaba and ByteDance are training AI models in southeast Asia](https://www.ft.com/content/96fe9898-a3a4-4a33-be1d-da06bdb6cb2b) https://docs.google.com/spreadsheets/d/1Xu6B3gVZhKvkQ1U5gmXgOgoflyzpgOydm60SYn_lAWE/edit?usp=sharingH100,B300H100,B300Malaysia
Meta Prometheus536343.001515917147117.842422Meta #confidentMeta #confident- [Meta blog post with details on Prometheus](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) - [New Albany Business Park land use map](https://drive.google.com/file/d/1Wb_BBVOnhu5UCQ8Q5d6iRIG9K_vigD8A/view?usp=sharing) - [Letter on Socrates South Power Generation Project](https://drive.google.com/file/d/1OMbFbdNGPmfSkwVWqOAK-5pOufiKQBu1/view?usp=sharing) https://docs.google.com/spreadsheets/d/1LOiioZUG696TC3nOAXROvhJBhhN7to-r6KR05Hd0qCk/edit?usp=sharingPrometheus #confidentB300B300Williams,American Electric PowerUnited States1 Community Cir, New Albany, OH 43054
DayOne Kempas480638.7064173825421.69166415.974523615648- [News of Phase 2 operation](https://www.moomoo.com/news/post/41886329/support-ai-computing-deployment-gds-holdings-nusajaya-technology-park-datacenter?level=1&data_ticket=1778269491837872) - [Archived DayOne website - "120 MW in operation" in Johor](https://web.archive.org/web/20241231165420/https://dayonedc.com/) - [Archived DayOne website - 390 MW "in service" in Johor](https://web.archive.org/web/20260314134756/https://dayonedc.com/market/johor) - [Financial Times report that Alibaba and ByteDance are training AI models in southeast Asia](https://www.ft.com/content/96fe9898-a3a4-4a33-be1d-da06bdb6cb2b) https://docs.google.com/spreadsheets/d/1R_LGG2zmZMczforjzOT_qqrBk-683L64lNIoQr5J1CY/edit?usp=sharingB300B300MalaysiaHP79+MP, 81300 Johor Bahru, Johor, Malaysia
Microsoft Fairwater Wisconsin445679.6361798888536913.978458Microsoft #confidentOpenAI #likely, Microsoft #likely- [Microsoft blog with engineering details](https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/) - [Microsoft blog with more general information](https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/) - [Construction Permit Application for building 1](https://drive.google.com/file/d/1azyXnreQBuYEqX2oaSUgePDGCMneez5Z/view?usp=sharing) - [Plan for 9-building and 6-building expansions](https://drive.google.com/file/d/1PQKzfauDNzabN7oNviMKTvsZmxlsUVpG/view?usp=sharing) - [OpenAI article mentioning they use Microsoft's Fairwater supercomputers](https://openai.com/index/mrc-supercomputer-networking/) https://docs.google.com/spreadsheets/d/1CRnOKjeb6z5VFPyeA7xaMrbppOD5dCS7TE20kvQyb8E/edit?usp=sharingMicrosoft AI WAN #confidentB200B200WE EnergiesUnited States4800 90th St, Mount Pleasant, WI 53403
Google Columbus331985.8514401212530311.478245999999999Google #confidentGoogle DeepMind #speculative- [DCD article detailing early work beginning on the site ](https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-columbus-ohio-data-center/) - [Transmission line construction notice; details current site capacity, expansion, and maximum future site capacity ](https://www.aeptransmission.com/ohio/docs/Hartman%20Farms%20Extension%20No.%202%20138%20kV%20Transmission%20Line%20Project%20Construction%20Notice.pdf) https://docs.google.com/spreadsheets/d/17vNqp7jsx3CUwFeUfxIyI3KA0uZ0Bh7BNkrVyH77Ohs/edit?usp=sharingTPU v5e,TPU v5p,TPU v6e,TPU v7TPU v5e,TPU v5p,TPU v6e,TPU v7United States5076 S High St, Columbus, OH 43207
Google New Albany323900.960080848933312.614706Google #confidentGoogle DeepMind #speculative- [Draft basis of air permit for Google Omaha, a similar data center](https://drive.google.com/file/d/1KN7o-wQOyt1UEud8wpM8PymXJF479r0n/view?usp=sharing) - Google’s [2025 Environmental Report](https://sustainability.google/reports/google-2025-environmental-report/) https://docs.google.com/spreadsheets/d/1b9T05Ze9Kv3Um4C6wv2uVYB0q7KgZ4AQaDPnaoh-ro0/edit?usp=sharingTPU v5e,TPU v5p,TPU v6eTPU v5e,TPU v5p,TPU v6eUnited States1101 Beech Rd SW, New Albany, OH 43054
Anthropic Lake Mariner292829.711975745332107.955219999999999AI XPV Platform #confidentAnthropic #likely- [Terawulf press release with details and timeline for Buildings 1-5](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) - [DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner](https://www.datacenterdynamics.com/en/news/google-offers-its-tpus-to-ai-cloud-providers-report/) - [Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York](https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure) https://docs.google.com/spreadsheets/d/1MrE3TlzhV8IPcb0uPixkfec3txcHt0iLTXhKjeFPsSU/edit?usp=sharingTPU v7TPU v7Google,BlackstoneUnited States7725 Lake Rd, Barker, NY 14012

data_centers_chip_quantities.csv

258 строк · 11 колонок · Обновлено 2026-11-09

Скачать CSV

HandleDateChip typeNumber of UnitsChip type sourceNumber of Units sourceOwnerUserNotesData centerTimeline
A100 at Microsoft Project Osmium on 2021-01-01T00:00:00.000Z2021-01-01A10025000EstimateEstimateMicrosoft #confidentOpenAI #speculative[Semianalysis](https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed) believes "~25k A100 chips" are in Building 1, taking 2/5 data halls in the building. Microsoft Project Osmium2021-01-01
A100 at Bridge Data Centres MY06 on 2022-12-31T00:00:00.000Z2022-12-31A10020513EstimateEstimateByteDance #likelyByteDance #likelyBuilding 1. Chip type based on NVIDIA chip sales in preceding quarter: https://epoch.ai/data/ai-chip-sales?view=graph&tab=count&designerSelect=nvidia&cumulative=false. ByteDance was reported as the anchor tenant for MY06 in 2022 (https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/).Bridge Data Centres MY062022-12-31
TPU v4 at Google Papillion on 2023-01-23T00:00:00.000Z2023-01-23TPU v4115242EstimateEstimateGoogle Cloud #confidentGoogle #likelyBuilding 1 (Q1 FY23 mix for new capacity. The one-quarter purchase lag from the operational date points to Q4 FY22, which predates the TPU_Production table, so the earliest available quarter Q1 FY23 is used). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.Google Papillion2023-01-23
TPU v5e at Google Papillion on 2023-01-23T00:00:00.000Z2023-01-23TPU v5e27322EstimateEstimateGoogle Cloud #confidentGoogle #likelyBuilding 1 (Q1 FY23 mix for new capacity. The one-quarter purchase lag from the operational date points to Q4 FY22, which predates the TPU_Production table, so the earliest available quarter Q1 FY23 is used). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.Google Papillion2023-01-23
H100 at Microsoft Goodyear on 2023-04-24T00:00:00.000Z2023-04-24H10029151EstimateEstimateMicrosoft #confidentMicrosoft #confidentH100 assumed from operational date (Q2 2023). Count = IT capacity / H100 HGX server power × 8 chips per server.Microsoft Goodyear2023-04-24
A100 at Bridge Data Centres MY06 on 2023-05-30T00:00:00.000Z2023-05-30A10065857EstimateEstimateByteDance #likelyByteDance #likelyAdding Building 2. Chip type based on NVIDIA chip sales in preceding quarter: https://epoch.ai/data/ai-chip-sales?view=graph&tab=count&designerSelect=nvidia&cumulative=false. ByteDance was reported as the anchor tenant for MY06 in 2022 (https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/).Bridge Data Centres MY062023-05-30
H100 at Microsoft Project Osmium on 2023-06-30T00:00:00.000Z2023-06-30H10032680EstimateEstimateMicrosoft #confidentOpenAI #speculativeType estimated based on chip sales data. # of units estimated based on power for Building 2.Microsoft Project Osmium2023-06-30
TPU v5e at Google Storey County on 2023-08-30T00:00:00.000Z2023-08-30TPU v5e153165EstimateEstimateGoogle #confidentGoogle DeepMind #likelyBuilding 1 expansion (Q3 FY23 mix for new capacity: v5e + v4; lagged one quarter from the operational date to account for purchase-to-operation delay), assuming it was fully retrofitted. Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.Google Storey County2023-08-30
TPU v4 at Google Storey County on 2023-08-30T00:00:00.000Z2023-08-30TPU v434609EstimateEstimateGoogle #confidentGoogle DeepMind #likelyBuilding 1 expansion (Q3 FY23 mix for new capacity: v5e + v4; lagged one quarter from the operational date to account for purchase-to-operation delay), assuming it was fully retrofitted. Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.Google Storey County2023-08-30
TPU v5e at Google Lancaster on 2024-01-01T00:00:00.000Z2024-01-01TPU v5e174561EstimateEstimateGoogle #confidentGoogle DeepMind #likelyBuilding 1 (Q4 FY23 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.Google Lancaster2024-01-01
H100 at CoreWeave Chester VA on 2024-01-31T00:00:00.000Z2024-01-31H10014800EstimateEstimateCoreWeave #confidentPartial CTP-01 estimate using 18 MW of IT power. H100 is my best guess for this 2024 capacity, but I did not find a Chester-specific chip disclosure.CoreWeave Chester VA2024-01-31
TPU v5e at Google Columbus on 2024-04-01T00:00:00.000Z2024-04-01TPU v5e147878EstimateEstimateGoogle #confidentGoogle DeepMind #likelyBuilding 1 (Q1 FY24 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.Google Columbus2024-04-01